# How long does it take to build a website?

Realistic timelines for a custom website, what each stage involves, and the three things that decide whether you launch on time or three months late.

Plyo Studio 10 September 2025 6 min read

On this page

[What the weeks are actually spent on](#what-the-weeks-are-actually-spent-on)[The three things that set the real timeline](#the-three-things-that-set-the-real-timeline)[What you can do to make it faster](#what-you-can-do-to-make-it-faster)[What a realistic schedule looks like](#what-a-realistic-schedule-looks-like) [Common questions](#common-questions)

Related service

[Astro websites](/services/astro)

Most custom marketing websites take six to twelve weeks from kickoff to launch. A one page site can be done in two. A large site with a CMS, a migration and custom functionality is usually three to five months. The range is wide because the build is rarely what slows a project down.

## What the weeks are actually spent on

A typical eight week build breaks down roughly like this.

Stage

Time

What happens

Discovery

1 week

Goals, audience, sitemap, what the site has to do

Design

2 to 3 weeks

Key pages designed for desktop and mobile, then the rest

Build

2 to 3 weeks

Components, pages, CMS, forms, integrations

Content

Runs alongside

Copy, images, product or team data

Testing and launch

1 week

Browsers, devices, redirects, analytics, handover

Design and build overlap less than people expect. Building from a half approved design means building twice.

## The three things that set the real timeline

### 1\. Content

This is the single biggest cause of delay, and it is almost always the client side. If the copy for fourteen pages does not exist yet, the site cannot launch no matter how finished the build is. Write the content early, or budget for someone to write it.

### 2\. How many people approve things

One decision maker is fast. A committee of five, each reviewing in their own time, adds weeks to every round. Agree up front who signs off and how long they get.

### 3\. Whether it is a rebuild or a replatform

A new site on a new domain is simple. [Moving an existing site](/blog/moving-from-wordpress-without-losing-rankings) means crawling every URL, mapping redirects and testing them before launch. Add two to four weeks.

## What you can do to make it faster

-   Write your content, or commission it, before design starts.
-   Gather your assets early: logo files, photography, team bios, product data.
-   Name one decision maker and give feedback in one consolidated round.
-   Say yes or no to a design direction rather than asking for both.
-   Get access sorted early: domain registrar, current host, analytics, CRM.

## What a realistic schedule looks like

Ask for a schedule with dates, not durations. “Design review on 3 June” is something you can plan around. “Two weeks for design” quietly becomes three when feedback takes five days.

A good schedule also names what is due from you and when. If your content is due on the 10th and arrives on the 24th, the launch date moves. That is not a surprise if everyone agreed it in week one.

If you want a timeline for your own project, send us the pages you have in mind and we will come back with a realistic schedule and what we would need from you.

## Keep reading.

[All posts](/blog)

-   [
    
    Process Cookie banners, analytics and consent 7 min read](/blog/cookie-banners-and-consent)
-   [
    
    Process How many pages does a website need? 7 min read](/blog/how-many-pages-does-a-website-need)
-   [
    
    Process What website maintenance actually involves 6 min read](/blog/what-website-maintenance-involves)

Updated 10 September 2025

FAQ

## Common questions

[Ask a question](/contact)

### Can a website be built in a week?

A single landing page, yes. A full marketing site, not well. The parts that take time are the decisions and the content, and neither compresses much.

### Why do some agencies quote three months and others three weeks?

They are usually quoting different things. A three week quote is often a template with your logo on it. A three month quote usually includes discovery, custom design, a CMS and testing. Compare what is in the scope, not the number of weeks.

### What happens if my content is not ready?

We can launch with a smaller site and add pages later, which is usually better than holding the whole project. A site that is live and earning is worth more than a perfect one still in staging.

About Plyo Studio

## Custom Astro websites. Built on Cloudflare.

Plyo Studio is an independent web studio that designs and builds fast, search-ready websites, web apps and interactive maps. Sites are custom-built in Astro and hosted on Cloudflare, so they load quickly and are easy for search engines and AI answer engines to read.

Founded by Chloe Nixon, a full stack developer and UI/UX designer from Australia, and Micky, a software engineer from New Zealand. Clients work directly with the founders from the first call to launch. Typical work: custom websites, migrations off Webflow, WordPress, Wix and Squarespace, web apps, and interactive maps and GIS. Projects are quoted at a fixed price before work starts.

[Start a project](/contact) [hello@plyo.studio](mailto:hello@plyo.studio) [About us](/about)

## Related pages

-   [Blog Read practical notes on designing, building and moving websites.](/blog)
-   [Astro websites Custom sites pre-built into lean HTML, for speed and search.](/services/astro)

Start a conversation

## Ready for a website that works harder?

[Start a project](/contact) [Free website audit](/audit)